PROJECT GALLERY
At Lind Equipment, we know jobsite lighting and power. And we know how to maximize LED technology to best serve the construction industry.
Our award-winning LED temporary lighting solution is the result of groundbreaking engineering coupled with decades of experience that has completely changed the game on lighting up jobsites. Our customers include some of the most respected contractors across North America who are leading by example in their dedication to sustainable building practices.
To date, the Jobsite360 community of contractors has collectively saved over 900M kilowatt hours!
PROJECTS AND CASE STUDIES
TWZ Group
Centre Block - Parliament Hill
Ottawa, ON - Canada
PCL Construction
Ice District
Edmonton, AB - Canada
Clark Builders
NAIT Productivity & Innovation Centre
Edmonton, AB - Canada
Ledcor Group
Tsawwassen Mills
Tsawwassen, BC - Canada
Zenith Systems
Amazon Ohio
Columbus, OH - USA
Custom Electric
Amazon YYC4 Warehouse
Calgary, AB - Canada
Harbridge + Cross
Anishnawbe Health
Toronto, ON - Canada
PCL Construction
Calgary Cancer Centre
Calgary, AB - Canada
Cleveland Electric
CHOA Hospital
Atlanta, GA - USA
Sun Valley Construction
Concrete Pour
Tucson, AZ - USA
IES Commercial
Elementary School
San Antonio, TX - USA
Beltline Electric
Gallatin Data Center
Gallatin, TN - USA
Paul Durham Electric
Natomas Crossing
Sacramento, CA - USA
J.W. Didado Electric
Sherwin Williams
Cleveland, OH - USA
PCL Construction
True North Square
Winnipeg, MB - Canada
Bana Electric
UBS Arena
Elmont, NY - USA
Fisk Electric
VA Hospital
San Antonio, TX - USA
Vader National Electric
Wexner Medical Center
Columbus, OH - USA
Tsawwassen Mills
Tsawwassen Mills is a 1.2 million square feet premium outlet shopping destination just outside of Vancouver, Canada. Home to dozens of well-known name brand stores, it is a hub of commerce for the area.
Ledcor Group was the general contractor for this project, which started in January of 2014. The project had many challenges at the start as it was located outside of electrical and sewer service areas.
Ledcor chose to pursue the Jobsite360 from Lind Equipment for this project to reduce the electricity usage and maintenance associated with bulb-based metal halide temporary high-bay lights. Especially at the beginning of the project, when the site was powered by generators, the Jobsite360 was looked to as a great way to reduce electrical consumption and costs. Additionally, since the electrical supply was subject to disruptions, the instant start and re-start capability of the Jobsite360 lights allowed the workers to continue their work with limited down-time.
On the project, over 255 of the 120W Beacon360's were deployed instead of 400W metal halide high bays. Ledcor used the Jobsite360 magnet mount configuration to attach the Jobsite360s to the structural steel and provide light to the workers throughout the site.
From the first usage of Jobsite360 lights in November 2014 through to the opening of the project to the public in October 2016, the Jobsite360 generated a huge amount of savings for Ledcor, the client, and the environment.
CALCULATING THE SAVINGS
Electricity savings of over $110,000
Replacement bulb savings over $10,000
Over 1,000,000 kWh of energy was saved
(equivalent to powering almost 100 homes for a year)
Over 700 metric tons CO2 was avoided
(equivalent to taking 149 cars off the road)