PROJECT GALLERY
At Lind Equipment, we know jobsite lighting and power. And we know how to maximize LED technology to best serve the construction industry.
Our award-winning LED temporary lighting solution is the result of groundbreaking engineering coupled with decades of experience that has completely changed the game on lighting up jobsites. Our customers include some of the most respected contractors across North America who are leading by example in their dedication to sustainable building practices.
To date, the Jobsite360 community of contractors has collectively saved over 900M kilowatt hours!
PROJECTS AND CASE STUDIES
TWZ Group
Centre Block - Parliament Hill
Ottawa, ON - Canada
PCL Construction
Ice District
Edmonton, AB - Canada
Clark Builders
NAIT Productivity & Innovation Centre
Edmonton, AB - Canada
Ledcor Group
Tsawwassen Mills
Tsawwassen, BC - Canada
Zenith Systems
Amazon Ohio
Columbus, OH - USA
Custom Electric
Amazon YYC4 Warehouse
Calgary, AB - Canada
Harbridge + Cross
Anishnawbe Health
Toronto, ON - Canada
PCL Construction
Calgary Cancer Centre
Calgary, AB - Canada
Cleveland Electric
CHOA Hospital
Atlanta, GA - USA
Sun Valley Construction
Concrete Pour
Tucson, AZ - USA
IES Commercial
Elementary School
San Antonio, TX - USA
Beltline Electric
Gallatin Data Center
Gallatin, TN - USA
Paul Durham Electric
Natomas Crossing
Sacramento, CA - USA
J.W. Didado Electric
Sherwin Williams
Cleveland, OH - USA
PCL Construction
True North Square
Winnipeg, MB - Canada
Bana Electric
UBS Arena
Elmont, NY - USA
Fisk Electric
VA Hospital
San Antonio, TX - USA
Vader National Electric
Wexner Medical Center
Columbus, OH - USA
Centre Block Rehabilitation
The Centre Block at Parliament Hill is an iconic national symbol of Canada and the home of Canada’s Parliament. The Centre Block Rehabilitation will modernize the century-old building for future generations while preserving its heritage as the heart of Canadian democracy.
TWZ Group is the electrical contractor responsible for the temporary lighting on this complex restoration project. TWZ Group Inc is a consortium of three electrical contractors, Ziebarth Electric, Wired Synergy and Toban Electric.
Committed to environmental sustainability and ensuring the best value for Canadians possible, the project team adopted Jobsite360 lighting throughout the project.
Over the service-life of the lights, the energy usage is projected to be reduced by over 5.5 million kilowatt hours, which is equal to powering more than 2,700 homes per year.
The CO2 emissions will be reduced by more than 4,000 metric tons and is equivalent to removing 1,243 cars from the road.
Jobsite360 lights require significantly less circuits, less maintenance, and are easier to install, relocate and uninstall. During the start of the restoration, the project team appreciated being able to increase efficiency while reducing the project’s carbon footprint.
On the Jobsite
Waste Diverted
An added environmental benefit is the significant amount of waste diverted from landfills because Jobsite360 lights are a reusable asset and the modular cords are field serviceable. Also, CFL bulbs contain mercury and are considered hazardous waste. When moving to LED lights harmful toxins are no longer an issue.
Flexibility and Versatility
Centre Block is one of the most important buildings in Canada and the protection of its many heritage components is a critical concern for the construction team.
With a project of such complexity and scale, using a modular daisy-chain verses traditional cumbersome stringlights provides a greater level of flexibility to light the project.
Jobsite360 lights have enabled the project to hang less temporary lights, use less installation points, less circuits and less energy, all while also illuminating more space.