
FULL-SERVICE SOLUTION FOR TEMPORARY LIGHTING AND POWER DISTRIBUTION
PEACE OF MIND FOR CONSTRUCTION MANAGERS
We handle the entire scope of planning and material delivery of temporary lighting and power throughout your project so you can focus on the critical deliverables that matter.
KEY BENEFITS






YOUR GOALS,
OUR SERVICES
Free up time for what’s most important. Discover how we can take the work off your plate.
- You provide us with the project drawings or blueprints, and our specialist team creates a layout for you, mapping what equipment you need and where to install it on your jobsite. We take into account all safety and electrical requirements, as well as any project-specific requirements.
- Our layout keeps in mind the functionality and benefits of our products, maximizing the efficiency of the jobsite, which ultimately results in savings for you.
- After incorporating your feedback on our layouts, we provide you with a temporary lighting and power distribution bill of materials so you can place your order.
- After placing your order, you can schedule when you need the various pieces of equipment. Need all the temporary lighting and power equipment for Floors 1-3 now and Floors 4-6 in a month? No problem. Our guaranteed delivery program makes sure that you can set it and forget it.
- Your project is assigned a dedicated success manager to provide ongoing support. Enjoy peace of mind with a hassle-free warranty and a team of knowledgeable professionals you can always depend on.
CLIENTS WHO TRUST US

PEACE OF MIND
We can take the work off your plate.
"I am finishing up a large hospital project (335,000 sq/ft) and had the opportunity to use Lind’s Jobsite360 temporary lighting solution.
Having always used string lights in the past, the Jobsite360 lighting system is by far superior.
The ability to run the lengths end to end for long distances is awesome. The lighting is LED, giving you the ability to run many lights on a circuit. I believe we ran an entire 80,000 sq/ft floor on only 3 circuits.
The installation of the lights is so much easier because of the triple connector on the daisy chains, which allows 3 directions to choose from. This allowed us to turn and go down the corridors and into rooms as required. This feature made installation and removal much easier as we did not have to always take the shortest route, which meant we didn’t have any cords through the walls to remove and patch later. This in turn saved us money on labour and maintenance.
We used 3 different types of Jobsite360 lights here (Blaze, High-Bay & Spark), which are all interchangeable. Being able to start with a High-Bay and then change to a Blaze or Spark as the walls were built was very useful. If we had a light that was damaged, it was easily replaced because the system is so modular.
If you have not used this system, you need to. I have been in this business for 40 years, and this is by far the best temporary lighting system I have ever seen and will never use anything else."

"The Jobsite360 system greatly reduced our carbon footprint during construction, adding significant value to our clients and the community. Most lights from 2015 on the Edmonton Tower are still in use today, demonstrating their quality and durability."

Jordon Meaver
Yard Manager
"Adopting the Jobsite360 was a simple way to substantially reduce carbon emissions while also delivering meaningful benefits on the jobsite."

Carly Weiss, B.Sc.
Sustainable Innovation Specialist
CASE STUDIES
CENTRE BLOCK - PARLIAMENT HILL
The Centre Block at Parliament Hill is an iconic national symbol of Canada and the home of Canada’s Parliament. Click and discover how Jobsite360 helped to modernize the century-old building for future generations.